欧美午夜福利影院在线免费观看|中文字幕一区二区三区三州|国内精品一区二区三区久久|一区二区三区字幕在线观看

Language:CHINESESENGLISH

Home > News > Steel structure construction of the
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.ntnk-color.com

Steel structure construction of the

Time:[2014-12-10]  Hits:5065

Rivers and lakes known as "cannon" Ren This is true retreat.

    Foshan Steel for Huayuan Property (600 743) Ren Zhiqiang, chairman of the "departure", the media will be positioned in 2014, "veteran developers" farewell the first year, which means that real estate developers of "regime change" is come It can not help but think, along with veteran developers leave the real estate market may have to undergo a major transformation, construction of steel-concrete structure gradual reduction, while the construction of the steel structure will be popular, associated with steel construction industry or will meet come true "beauty" and "good" golden age.

    Fengyuyulai

    Like Electric's alternative steam era, the Internet's overthrow same electrical era, evolution's no obstruction. Because of this, the steel structure built of reinforced concrete construction of an alternative "big change" is brewing, on the basis that the construction of China's domestic steel industry accounted for 20%, but the steel structure construction accounted for less than 4%, while the steel structure residence only 2% of the total construction area of ​​the house at the mercy of the same index difference compared with developed countries several times.

    Whether or policy to market rumors, people support "green building" simply was one-sided trend.

    With the rapid advance of new urbanization, the construction industry transformation and upgrading track and the construction of industrial policy of continuous improvement, specifications, specification, construction of steel structures are ready to go, which is more intuitive feel in Hua Hin. Huaxing Steel construction of a total built up area of ​​340,000 square meters of apartment-German enjoying Shandong Zibo (real estate) City, a collection of living, health care, sports and many other functions for one, and the whole project to create a unique, prefabricated steel structure body , compact integrated floor planning system, especially the new wave of web timber, in terms of construction and materials even better. Huaxing independent research company selected to build a new type of wave web timber, such a large span of the new material, than the average savings of more than 30% of H-shaped steel timber, and the intensity of it is better than ordinary steel, steel structure built comfort, is superior to the traditional reinforced concrete construction.

    Guangde apartment enjoying its beam system works all use the web members Huaxing Steel wave produced by the company. Production requirements for the implementation of high-specification, Huaxing Steel Company production process is optimized according to the length of the fly plate girder webs short features, technology department to take a temporary installation at the ends of the web "auxiliary board" approach, making the web flush with the wing, to ensure the robot wave web production equipment, steel beams in the scanning process to complete imaging, greatly improving the accuracy of component weld size.

Same as building blocks to build a house

    Making cars and building blocks like the same house built! It sounds incredible, but the dream was living in steel construction in implementation. Explore the steel structure residence, is the choice of factory, industrial pipeline operations, will create walls, roof and other components and parts needed for the house, according to the size of the room well, and then transported to the site with integrated, built on a like "the same building blocks" cover up.
    
    "The construction of industrial modernization" was, different people have different interpretations of the steel industry, the want is resource intensive, sophisticated construction technology, the function of all of the industrial cycle and so on. Throughout the development of the domestic real estate market change in the situation over the past decade, housing prices have boasted property Gangster golden age has passed. Faced with a new round of market changes, green construction into a consensus, construction companies enthusiasm is also high, with our common needs, steel structure construction industry will undoubtedly become a "meat and potatoes" under the new economic normality. Far in 2014, many companies in the field of industrial action residence frequently, and even now some action prior to start of construction of the Nuggets in the steel structure!

    Industrial innovation, the emergence of new materials, intelligent equipped emerged. Steel structure residence industry flourished, change the past, "single," the short-lived type of change, this transformation, starting from raw materials, production equipment, research and development planning of the entire program. For example Huaxing company, independent research and development with a wave of the web production, development of new steel structure construction wave web timber, with supporting steel structure as well as skilled construction planning team, formed a "technology + with + service" steel construction industry, "Made in force."

    Huaxing done to explore the steel structure industry, because of the development, a new type of timber used in the materials, energy saving, green, green occupying a "starter" advantages, such as practical, different spans and member section height, save more than 30% of steel, wave web span greater carrying capacity is higher. Now, after the cut Huaxing Bo technology with the second generation of the web, has now entered the joint commissioning with the second-generation wave is characterized by the production of the web can suppress 14mm webs, after welding on the wing, it will be the original span of 2 to three times as much, which will build schools, hospitals, airports and other large-span steel structure to provide high-quality building materials.

    Speed ​​up the real estate "to stock"

Standardization do support, a batch of factory automation to human, intelligent efficient, integrated and promote integration. Relying on "five" and pushed the advantage again if blessing "house built construction general contracting level talent," the Ministry of Housing, industrial steel companies such as "full layout" and its ability to break one can imagine.

    In Beijing (real estate) subway line six projects, the successful application of web waves, opened Huaxing Steel's "subway era." Large span, high strength, fine stucco exterior handle, the wave of the web is not only practical in the subway project in the "superior" and its inherent momentum, but also works side by side with the super.
    
    Because access to "house construction project general contracting talent," in terms of Huaxing, various spans 40 floors below the house construction project, the construction of 240 meters below the object, 200,000 square meters and below residence residential steel construction of the main project, Huaxing can undertake construction.

    "Not only do the main body, and water, electricity, heating, gas, we have to make supporting high specification form a unified standard." Huaxing Steel general manager Zhang Yong this view, at the beginning of the construction plan, Huaxing go is the "standard way", who can be made to integrate standard "exaggeration", from technical planning regulations to shelter planning regulations, to welding, fire, corrosion specifications are in accordance with iron nails style "standardized" implementation. This is precisely made for the members of the bedding factory production, precision equipment and technology from the guarantee, to factory production transformation that automation and intelligence support, do nothing, anything, in order to promote, production efficiency can quickly progress, but also able to demonstrate the advantages of performance.

    Concept in the green construction process of the formation, the more relevant for other construction. After the construction of the assembly taken to create, construct decoration integration "fit", greatly reduced the construction project of intermediate links, shorten the construction period. House panel selected steel truss floor boards, so that the floor is more behind. For Huaxing, the independent implementation of reinforced truss factory production, no templates and scaffolding, only 1/2 of this process will shorten the construction cycle than traditional concrete.

    In the innovative wisdom, the new material is "a menace", materials and construction on this issue solved, directly contributed to the integration of the cast insulation wall decoration. And information management processes in multiple specialized systems ERP, PKPM-CAD, 3D3S, etc., from structural modeling to production and processing, the whole process of digital management, that is, something to build on, only unexpected, did not do reach.

    Estate's "destocking" voice still ringing in the steel construction industry change is strong shelter. Many business predators, but also keen insight adjust the capital to invest, many of whom ran the steel industry, the implementation of their plan Nuggets. At this time, Huaxing Steel also discover the future, in the process of industrialization in the steel construction, catch "the first train."

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)