欧美午夜福利影院在线免费观看|中文字幕一区二区三区三州|国内精品一区二区三区久久|一区二区三区字幕在线观看

Language:CHINESESENGLISH

Home > News > Guangzhou Steel News: Exhibition Kunming Steel Works successfully put into use
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.ntnk-color.com

Guangzhou Steel News: Exhibition Kunming Steel Works successfully put into use

Time:[2015-6-24]  Hits:4792

Guangzhou Steel News: Exhibition Kunming Steel Works successfully put into use
   
June 16, the third China Expo South is concluded, marking the construction of the Dianchi Lake in Kunming World Steel Works Exhibition Center project successfully put into use, and set to open steel big screen debut "Peacock" in the face of domestic and foreign visitors to the exhibition style. Guangzhou Steel
Dianchi Lake in Kunming World Exhibition Center project Steel Works Co., Ltd. invested by the construction of a Yunnan, Ltd. is responsible for the outer steel mesh deepen the design, manufacture, installation.
It is reported that the world's Convention and Exhibition Centre, Kunming Dianchi steel mesh semicircular distribution to the peacock as prototyping, volume 1.1 million tons, the use of domestic rare, Yunnan's first variable cross-section of bending and torsion of thin-walled shaped space fully welded structure, application of bending and torsion member total of more than 4100 pieces, bending and torsion ranks first in the number of components as much as similar projects in the country, and the viewpoint of bending and torsion of each member, there was no common direction. Especially in the main hall of the sequence of two vases, bending twist unprecedented degree, described as "like a column of non-column, non-beam like beam." Vases, 24 meters high, each 123 vases made of steel components assembled, each bar weighing 163 tons, the degree of bending and torsion vases shall also be a Yunnan most. The project was September 27, 2014 began lifting, and on January 29, 2015 two days ahead of the cap, which took 125 days. Guangzhou Steel
Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)