Construction and installation of steel structures virtual simulation process (Figure)

Time:[2016-5-18]  Hits:4463

Construction and installation of steel canopy virtual simulation processes (renderings)
1, 120 tons crawler crane platform canopy will complete the installation of steel columns東莞鋼結構仿真施工安裝圖1
2, the erection of the support frame, lifting the first string truss Pin東莞鋼結構仿真施工安裝圖2
3, lifting the second-Pin Truss - string, and connect with the ball intermediate node東莞鋼結構仿真施工安裝圖3
4, lifting the third string truss Pin東莞鋼結構仿真施工安裝圖4
5, lifting the fourth Pin truss string東莞鋼結構仿真施工安裝圖5
6, between the truss and install GZ2東莞鋼結構仿真施工安裝圖6
7, lifting the fifth string truss Pin東莞鋼結構仿真施工安裝圖7
8, the installation sixth Pin truss string東莞鋼結構仿真施工安裝圖8
9, tie bars and rope hoisting truss structure between東莞鋼結構仿真施工安裝圖9
10, lifting lower Pin String Truss Structure東莞鋼結構仿真施工安裝圖10
11, when mounted to the seventh Pin truss string, remove the first set of truss support11
12, install eighth Pin truss string, remove the second set of truss support東莞鋼結構仿真施工安裝圖12
13, install the ninth Pin truss string, truss demolish the third group東莞鋼結構仿真施工安裝圖13
14. Similarly, the remaining string Truss completed14
15, complete roof structure system, for local cable force trimming, removal of the support frame東莞鋼結構仿真施工安裝圖15
16, steel platform canopy installation東莞鋼結構仿真施工安裝圖16

 