欧美午夜福利影院在线免费观看|中文字幕一区二区三区三州|国内精品一区二区三区久久|一区二区三区字幕在线观看

Language:CHINESESENGLISH

Homepage > Product > Volkswagen steel plant
Contact Us
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:梁先生/Mr Leung
  • Phone:18900873383/18900873268
  • E-mail:sbs@sbsprefabhouse.com
  • Skype: sbs-Candy
  • URL:http://m.ntnk-color.com

Volkswagen steel plant

Volkswagen steel plant

 

 

Volkswagen Steel structure workshop project

1.Engineering cases:

 

2.The detail material for the steel structure

The steel structure material is included the H section,I section,Square tube,Circular Tube,Floor decking steel sheet,C section,Z section,Angle iron , Steelbar ,Steel plate .

3.Steel structure workshop
Steel structure workshop is mainly refers to the main bearing component is composed of steel. Including the steel columns, steel beam, steel structure, steel roof truss (of course the span of plant is bigger, basic is the prefabricated steel structure truss now), steel roof, pay attention to the wall of the steel structure maintenance also can use brick wall.
  1. Features: fast and flexible to assemble, safe, thermal and noise insulation, water proof and fire prevention;
  2. Cost-effective: Fast and easy installation greatly shorten the construction time which reduce the costs;
  3. Durability: The whole structure is easy in maintenance, which can be used for more than 50 years.
  4. Perfect design: Perfect design completely avoids leaks and water seepage. Meanwhile, it's also in line with the national level of fire prevention.
  5. Carrying capacity: can resists the impact of strong wind and seismic performance and bears heavy snow loads.
Due to the above advantages, combination of light china steel building structures in construction engineering, railway, petrochemical industry, water conservancy construction highway construction and military engineering and earthquake relief in the fields of temporary is widely used in construction.

 

4.Commonly used steel materials and the performance of the steel:

1) carbon structural steel: Q235B, Q345B, etc.

2) high strength low alloy structural steel;

3) high quality carbon structural steel;

4) alloy structural steel special steel;

5) special purpose steel;

6) walls and roofing material is optional: corrugated steel plate, EPS sandwich panel, rock wool sandwich panel and polyurethane sandwich panel

 

5.Guidance installation

Shengbang Steel Structure Company can supply the guidance installation service.Usually steel structure building is a large installation engineering. If customers may need the professional technical engineer to supervise the installation on site overseas, the customer must to inform before 1 months from leave the China . But customer should coordinate with us for following aspects:
Customer should provide:
  1) Translator or assistant on site.
  2) All costs raised including:
    A. visa fee
    B. Round trip flight ticket
    C. Accident insurance for the supervisor during the period
    D. Accommodation
    E. Daily meals
    F. Internet
    G. Local traffic fee (if any)
  3) The customer should pay the engineer with supervision fee, which can be negotiated and decided by both.
  4) Customer has the responsibility to provide necessary security system to protect the supervisor, especially in some unrest countries.
There have some guidance installation picture:

 

5.Contact way

  1)FOSHAN SHENGBANG STEEL STRUCTURE CO., LTD
  2)Add:Pingtang Industrial Park, Shipeng Village, Shishan Town, Nanhai District,
  3)Foshan, Guangdong Province, China
  4)Tel:0086-757-63323396/0086-757-18900873268 Fax:0086-757-81196682


Hits:9156 Time:[2023-4-15]

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號