欧美午夜福利影院在线免费观看|中文字幕一区二区三区三州|国内精品一区二区三区久久|一区二区三区字幕在线观看

Language:CHINESESENGLISH

Homepage > Product > Guangya steel villa
Contact Us
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:梁先生/Mr Leung
  • Phone:18900873383/18900873268
  • E-mail:sbs@sbsprefabhouse.com
  • Skype: sbs-Candy
  • URL:http://m.ntnk-color.com

Guangya steel villa

Guangya steel villa

 

 

Guangya steel villa

1.Engineering case:

 

2.Steel structure panel materials

steel structure panel Material:including wall panel and roof panel

Sandwich plate core material material: EPS, rock wool, PU, glass wool

Sandwich board material thickness: 50 mm, 75 mm, 100 mm, 150 mm

Single color plate material thickness: 0.376 mm, 0.426 mm and 0.476 mm

 

 

 

3.Product details

Main structure Steel Welded H Section
Purlin C Section Channel or Z Section Channel
Roof Cladding Sandwich Panel or Corrugated Steel Sheet with Fiber Glass Wool Coil
Wall Cladding Sandwich Panel or Corrugated Steel Sheet
Tie Rod Circular Steel Tube
Brace Round Bar
Column & Transverse Brace Angle Steel or H Section Steel or Steel Pipe
Knee Brace Angle Steel
Roof Gutter Color Steel Sheet
Rainspout PVC Pipe
Door Sliding Sandwich Panel Door or Metal Door
Windows PVC/Plastic Steel/Aluminum Alloy Window
Connecting High Strength Bolts
Packing Can be loaded into 40ft'GP/HQ/OT, or 20 ft'container.
Drawing We can make the design and quotation according to your requirement or your drawing

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4.Advantage:

1)Quick and easy to assemble
2)Dry construction and environmentally friendly.
3)Light houses with strength structure
4)Excellent capacity of water proof, heat and sound insulation.
5)Materials 100% recyclable
6)Convenient to take apart and install.
7)Dry construction condition; no pollution; no waste.
8)During the construction, total saving 1/6 of CO2 Emissions, 1/6 of natural resources, 1/6 of natural energy and 9/10 of water using. Save labor cost on site.
9)The building self-weight is only 1/4 of brick-concrete structure.
10)Galvanized steel is 100% recyclable.
11)Fiber glass insulation filling in the roof is greatly superior to the brick structure on the effect of insulation and soundproof.

 

 

5.Service flow path:

Discussing Project——Design Plan Drawing——Budget & Quote——Confirm Drawing&Quotation——Sign the Contract——Make the shop Drawing——Manufacturing——Transportation——Shipping——Foundation Ready——Guidance Installation——Finshed Installation

 

 

Contact way

1)FOSHAN SHENGBANG STEEL STRUCTURE CO., LTD
2)Add:Pingtang Industrial Park, Shipeng Village, Shishan Town, Nanhai District,
3)Foshan, Guangdong Province, China
4)Tel:0086-757-63323396/0086-757-18900873268 Fax:0086-757-81196682

Hits:9704 Time:[2020-8-30]

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)